Field Notes

Shear Pins, Vent Holes, and Why Dual Deploy Still Fails

How many nylon pins a 3- or 4-inch coupler actually needs, why av-bay vents are not optional, and the failure modes of dual deploy.

By Burn Wire

You can buy the right altimeter, wire a clean dual-deploy sequence, and still prang the rocket because the airframe physics were wrong. The coupler was too tight. There were no vents. There were six shear pins on a charge sized for two. Or there were zero pins, and the main came out at Mach.

This is the mechanical half of recovery reliability. Charge mass lives in the black-powder sizing guide. Bay layout lives in the avionics-bay article. Here we talk about the two cheap parts that decide whether those systems are allowed to work: nylon pins and holes.

If you only remember one pairing: pins and powder are one design. Change one, re-test the other.

FIELD NOTE

Locked remainder

Continue this Field Note

A Range Pass opens every Field Note plus markdown downloads.

Behind the perforation

  1. What a shear pin is for
  2. Common sizes
  3. How many pins
  4. The failure mode of too many pins
  5. The failure mode of zero pins
  6. Vent holes: two different problems
  7. 1. Avionics-bay static ports
  8. 2. Chute-bay pressure
  9. Why dual deploy still fails when the wiring is “fine”
  10. Coupler fit and grease
  11. Ground-test the pin count
  12. Field checklist

Purchases are temporarily unavailable. Please check back soon.

Compare plans

Bought on another device? Restore access

Shear Pins, Vent Holes, and Why Dual Deploy Still Fails | Burn Wire